Insights Cable Route Geophysics

When Sand Waves Move Over a Cable: Turning Repeat MBES and SSS into a Cover-Risk Decision

5 min read

Conceptual migrating sand waves and decreasing seabed cover above a subsea cable

A cable can have adequate cover at installation and insufficient cover years later without the cable moving. Where sand waves migrate, the seabed datum above a fixed cable changes. A single MBES surface describes today’s bed, not the future minimum cover. For export cables and inter-array corridors in energetic shelves, a defensible interpretation combines repeat bathymetry, side-scan sonar (SSS), subsurface geometry and installation records. The important question is how much of the protective sediment envelope might be removed before the next intervention.

Bedforms can translate, change height, flatten after storms and reform with different asymmetry. Their behavior varies between fields and even along one corridor. It is tempting to quote one regional migration speed and project it across the asset lifetime. That shortcut may miss local scour at a crossing, a bank flank that erodes rather than translates, or a cable segment installed near a trough. Recent research using field MBES and numerical modelling demonstrates why changing bedforms matter to offshore structures, while long-term field observations show that cable and pipeline embedment can evolve with seabed mobility. Those studies provide context, not a site-specific design rate.

Conceptual repeated MBES seabed profiles across migrating sand waves above a buried subsea cable with minimum cover highlighted
Conceptual repeat-survey comparison: the critical measure is minimum future cover above the as-laid cable. Illustrative, not a forecast for a real route.

Start with compatible surveys

Before subtracting two MBES grids, confirm both use the same horizontal reference, vertical datum, tide or GNSS height reduction, sound-speed treatment and grid convention. Register stable seabed features or surveyed structures where appropriate, and inspect swath overlaps. A 0.4 m apparent difference caused by datum inconsistency can be larger than the morphological change you want to detect. Preserve the original soundings and uncertainty surfaces, not only color-coded difference maps.

Resample both epochs to a cell size justified by the footprint and positioning uncertainty. Avoid claiming that a 0.25 m grid detects 0.25 m seabed change if the vertical uncertainty is larger. Compute change of elevation, then mask cells whose magnitude is below the combined survey uncertainty or otherwise distinguish “unresolved” from real change. If uncertainty varies with depth, slope and swath edge, use spatially variable thresholds. Profiles perpendicular to sand-wave crests are often more informative than a single corridor-wide mean.

Use SSS as context. Backscatter and acoustic shadow can delineate crest texture, ripples, exposed rock, debris, cable protection or possible exposed cable. But radiometric differences between acquisitions, range and sonar geometry can change tone without sediment change. A stable, co-located MBES slope break and SSS texture boundary is stronger evidence than one bright mosaic patch. Inspect raw records at critical anomalies; route-wide mosaic cosmetics should not decide a cable repair.

Measure migration and vertical change separately

Track identifiable crests and troughs between epochs, preferably using multiple profiles and a documented matching rule. Crest displacement divided by time gives an observed migration rate over that interval. It does not guarantee the same rate in the next interval. Also map local erosion and deposition at the cable chainage; a translating waveform can give strongly different vertical trends at adjacent points. If crests merge or change shape, report the ambiguity rather than forcing a one-to-one match.

For a hypothetical two-survey example, suppose a crest is 12 m farther along the transport direction after three years: an observed average of 4 m/year. Meanwhile the bed elevation at cable chainage 2.4 km is 0.6 m lower. Neither number alone tells us cover. If the verified top-of-cable elevation is −22.0 m on the same vertical datum and the present seabed is −20.9 m, geometric cover is 1.1 m. If a future trough reaches −21.5 m, cover would fall to 0.5 m. This is a scenario, not a forecast; installation and survey errors must be included before an action threshold is set.

Critically, a post-lay burial tool’s reported burial depth and an MBES seabed elevation are different measurements. Compare against verified as-laid cable position or later cable detection with known uncertainty. Where cable position is poorly constrained, a bedform change map cannot alone confirm actual cover. Use a cable tracking method suited to the cable and protection design, and reconcile chainage, coordinate system and offsets before combining observations.

Look below the migrating layer

SBP or 2DHR may reveal a basal surface, older strata or sediment thickness beneath an active sand-wave field. This helps determine whether clearance, trenching and future scour might approach a harder substrate. It does not establish a universally stable erosion limit. Some acoustic reflectors are impedance boundaries, and penetration can fail locally. Tie the interpretation to geotechnical data where the distinction changes installation feasibility.

Build scenarios for the relevant operation period: observed erosion envelope; a more conservative stress case informed by local hydrodynamics, storm exposure and repeat surveys; and a monitoring trigger. Do not simply extrapolate a short interval linearly for 25 years. Repeat surveys may bracket different tide, wave and storm histories; explain the dates and forcing context. A 2024 field and modelling study of migrating sand waves near foundations illustrates the physical significance of mobility, but route-specific rates require local evidence.

A decision table at each critical chainage

For every segment, list verified cable top elevation, latest seabed elevation, present cover and uncertainty, measured seabed change, bedform position, plausible erosion scenario and inspection trigger. Prioritize segments where a trough is approaching, where erosion already exceeds survey uncertainty, and where present cover plus uncertainty is close to the asset’s required protection. A known uncovered or exposed section demands engineering review under the project’s asset management plan; the geophysics report should clearly distinguish observation from remedial design.

The next survey should be timed to the decision. A fixed annual schedule may be adequate in a slow, well-characterized field, while an active crest approaching a critical crossing can justify earlier inspection or event-based monitoring. Maintain consistent survey lines and datums so each new campaign improves the time series. The useful deliverable is not only a handsome change map: it is a reproducible, chainage-based account of where protective cover is likely to be lost and what measurement would confirm it.

References and further reading

Leave a Reply

Your email address will not be published. Required fields are marked *

Send us your scope and get a quotation in 24 to 48 hours.

Tell us the sensors, line kilometres and deliverables. A geophysicist reviews every request, and your data and documents stay confidential.